Trending...
- Madison: John Nolen Drive Reconstruction Begins Monday, October 13
- Madison: Next Phase of Public Meetings for Southwest and Southeast Area Plans Scheduled
- Street Closures for UW Madison Homecoming Parade
WASHINGTON - WisconsinEagle -- In the time of the COVID-19 outbreak, Tejjy Inc. facilitates the expansion of healthcare industry infrastructure in the USA through BIM prefabrication and modularization technology. Conventional construction methods cannot meet the high demand for creating large-scale hospital infrastructure as enabled by prefabricated BIM (Building Information Modeling) technology.
Sukh Singh, the Vice President of Tejjy Inc. stated in this regard that "As healthcare construction tends to be project-centric, using various project stakeholders to learn about the process of working together, our BIM Prefabrication method helps to manufacture building elements off-site. Rather than a conventional linear build, where every process depends upon the next, BIM (Building Information Modeling) prefabrication technique moves in a synchronized way, leading to cost efficiency and schedule reduction. Using the prefabrication technique, our BIM engineers help to improve safety and enhance productivity for hospitals, causing less disruption to adjacent areas, and the general patient experience."
More on Wisconsin Eagle
"The architects and designers need to shift from the 'stick-built design' towards an element-centric pre-fabricated BIM design for the bathroom pods, the ceiling of an operating room, or an exterior wall panel. Design teams of the construction projects can then work using Design for Manufacturing Assembly principles, emphasizing the way the prefabricated elements are designed for manufacturing and ease of assembly. All project stakeholders including the subcontractors, manufacturers and general contractors should be referred to as associates from the early stage of design optimization through BIM, facilitating real-time collaboration, and acting as powerful tools during the entire construction workflow." – added Sukh.
Senior BIM project manager of Tejjy Inc. said –"BIM-enabled dynamic practice helps general contractors to associate with manufacturers or subcontracting firms for understanding their prefabrication design & manufacturing competencies and implementing element-centric target costing, thus envisioning the prefabricated elements through multi-trade subassemblies and modules."
More on Wisconsin Eagle
BIM Marketing Head of Tejjy Inc. Mrs, Reetie Lubana specified – "Subcontractors in the healthcare industry are combining skills with our innovative BIM techniques for supporting sophisticated, data-rich designs to be shared with AEC project stakeholders. Our BIM team is facilitating subcontractors to capitalize on automation and sophisticated quality assurance practices to further enhance production. Through BIM prefabrication, we can successfully reduce the disruption of operating healthcare campuses with minimized traffic, noise, and dust."
During the unprecedented time of COVID-19, healthcare is performing exceptionally by caring for those afflicted with the virus. By adopting BIM prefabrication & modularization there's a prospect for design & construction to speed up healthcare construction in the future and deliver beds as and when required.
To know more about BIM pre-fabrication & modularization, call Tejjy Inc. at 202-465-4830 or email at info@tejjy.com to discuss your Prefabrication and Modularization requirements in the USA.
Sukh Singh, the Vice President of Tejjy Inc. stated in this regard that "As healthcare construction tends to be project-centric, using various project stakeholders to learn about the process of working together, our BIM Prefabrication method helps to manufacture building elements off-site. Rather than a conventional linear build, where every process depends upon the next, BIM (Building Information Modeling) prefabrication technique moves in a synchronized way, leading to cost efficiency and schedule reduction. Using the prefabrication technique, our BIM engineers help to improve safety and enhance productivity for hospitals, causing less disruption to adjacent areas, and the general patient experience."
More on Wisconsin Eagle
- Crank Up the Fun Factor with Fusion Plus Lightning Edition
- Chic and Secure: The Blue Luna Debuts Stylish Keychains with Purpose
- BEC Technologies Showcases Leadership in Private Broadband Ecosystem with Inclusion in UTC's Ecosystem Summary Report
- $500,000 in Stock Dividend for Shareholders in 2025 Sweetens The Pot on Success of Becoming Debt Free with No Convertible Notes or Warrants for $IQST
- Milwaukee Job Corps Center: Essential Workforce Training—Admissions Now Open
"The architects and designers need to shift from the 'stick-built design' towards an element-centric pre-fabricated BIM design for the bathroom pods, the ceiling of an operating room, or an exterior wall panel. Design teams of the construction projects can then work using Design for Manufacturing Assembly principles, emphasizing the way the prefabricated elements are designed for manufacturing and ease of assembly. All project stakeholders including the subcontractors, manufacturers and general contractors should be referred to as associates from the early stage of design optimization through BIM, facilitating real-time collaboration, and acting as powerful tools during the entire construction workflow." – added Sukh.
Senior BIM project manager of Tejjy Inc. said –"BIM-enabled dynamic practice helps general contractors to associate with manufacturers or subcontracting firms for understanding their prefabrication design & manufacturing competencies and implementing element-centric target costing, thus envisioning the prefabricated elements through multi-trade subassemblies and modules."
More on Wisconsin Eagle
- Aissist.io Launches Hybrid AI Workforce to Solve AI Pilot Failure for Customer Support Automation
- Christy Sports Makes Snowsports More Accessible for Families to Get Outside Together
- MainConcept Completes Management Buyout to Become Independent Company
- LIB Industry Expands Full-Series Salt Spray Corrosion Test Chambers to Meet Global Testing Standards
- The Easy Way to Collect Every Wedding Photo from Your Guests - No App Needed
BIM Marketing Head of Tejjy Inc. Mrs, Reetie Lubana specified – "Subcontractors in the healthcare industry are combining skills with our innovative BIM techniques for supporting sophisticated, data-rich designs to be shared with AEC project stakeholders. Our BIM team is facilitating subcontractors to capitalize on automation and sophisticated quality assurance practices to further enhance production. Through BIM prefabrication, we can successfully reduce the disruption of operating healthcare campuses with minimized traffic, noise, and dust."
During the unprecedented time of COVID-19, healthcare is performing exceptionally by caring for those afflicted with the virus. By adopting BIM prefabrication & modularization there's a prospect for design & construction to speed up healthcare construction in the future and deliver beds as and when required.
To know more about BIM pre-fabrication & modularization, call Tejjy Inc. at 202-465-4830 or email at info@tejjy.com to discuss your Prefabrication and Modularization requirements in the USA.
Source: Tejjy Inc.
0 Comments
Latest on Wisconsin Eagle
- Taraji P. Henson's Boris Lawrence Henson Foundation (BLHF) Announce 5th Annual Can We Talk? Arts & Wellness Summit and "i AM The Table Benefit Brunch
- Mullins McLeod Surges Into SC Governor's Race with $1.4 Million Raised in First Quarter; Most from His Own Commitment, Not Political Pockets
- Mensa Members Put Brainpower to Work for Literacy
- Rep. Gina H. Curry and Dr. Conan Tu Inspire at Kopp Foundation for Diabetes Hybrid Fundraising Gala and National Leadership Forum
- Elliott Expands Investment Services with Naviark App Launch
- Restoration Dental Introduces YOMI Robot for High-Precision Implant Surgery in Oklahoma
- Elite Rooter Creates Jobs and Expands Reach Coast to Coast with New Tampa, FL Plumbing Location
- "Super Leftist", the new poetry book by Pierre Gervois
- RNHA FL Unveils Bold New Leadership Ahead of 2026 Elections
- ASI Honors Client Achievements at 27th Annual iNNOVATIONS Conference
- Lightship Security and the OpenSSL Corporation Submit OpenSSL 3.5.4 for FIPS 140-3 Validation
- WADA AWARDS - where Diamonds melt into glamour
- First Nations Bank of Canada Partners with KYC2020 to Strengthen AML Screening and Monitoring Capabilities
- Bitcoin will still be the leader in the cryptocurrency market in 2025, and WOA Mining enthusiasts will earn passive income
- Triumph Thru Tears Premieres at 55th Anniversary Pamoja Celebration at the University of Georgia
- Helping Haircare Brands Launch with Confidence: Bond & Bloom Innovation Group Leads in Product Development
- Holiday Fineries at the Wineries on the Shawangunk Wine Trail
- Chadwick Twillman Demands Resignation of MLive Editor Joey Oliver for Publishing Deceptive Hit Piece
- Smile More Implant Centre Launches Cutting-Edge Website
- K2 Integrity Names Aaron Karczmer Chief Executive Officer